![]() |
Enron Mail |
Group,
Effective October 1st...BPA transmission will be the following prices... BPA non-firm point to point (or network) will be $2.92 with 1.9% losses BPA non-firm on the intertie will be $3.34 with 3% losses Losses could be expected to add up to $5 of the total price--do not put losses into the purchase from BPA Transmission in Enpower--losses for BPA will be settled at the end of the month in a single annuity. Total price for MPC to CAISO at MALIN on BPA non-firm all the way will be $6.26 Total price for MPC to CAISO at NOB on BPA NON-FIRM all the way will be $6.26--Remember to check tranny sheet for PGE-tranny availability--WE HAVE NO MORE LT FIRM FROM BIG EDDY TO NOB-- SNOPud is charging $3.25 for point to point plus 1.9% losses. Bill
|