Enron Mail |
Dear Sir; Due to boilerproblems we will have a delay. Speed is now 12-13 knots on one boiler. It is a bit early to say when the other boiler will be in operation, but hopefully this evening. I will keep you updated. HOEGH GALLEON, DATE:07-June-01 12:00 16:00 (UTC) A) Position at noon: N 24? 01' W 082? 10' B) Dist. From last noon: 337 nm C) Dist. To go to next port: 712 nm D) ETA next port: LAKE CHARLES 09-Jun 09:00 LT E) 1: Av. wind/sea Wind: ESE 3 Sea: 3 2: Average speed 14.04 kn RPM: 69.56 3: BOG 186.2 m3 5: F.O Consumed 29 MT 6: G.O. Consumed 0 MT 7: Average vapor press Average liq. Temp: Tk1: 0.128 bar -158.13 ?C Tk2: 0.126 bar -158.19 ?C Tk3: 0.127 bar -158.22 ?C Tk4: 0.125 bar -158.21 ?C Tk5: 0.130 bar -158.13 ?C Brgds Knut Bentzr?d Master LNG/C "Hoegh Galleon" E-mail: master.gall@hoegh.no Teleph: Inmarsat tel.no. 330853910 Fax : Inmarsat fax no. 330853913 Telex : Inmarsat B telex no. 330853915 Telex : Inmarsat C telex no. 430853910 (24hrs.watch)
|