Enron is willing to perform the operation under question (1) but not (2) and (3) as we have no control over these processes and only have control over process (1). The System Controller can contact Enron Canada Power Corp at the number in your files. -----Original Message----- From: Richey, Cooper Sent: Friday, December 07, 2001 8:30 AM To: Zufferli, John Subject: FW: Supply Shortfall Procedures in case you didn't get this -----Original Message----- From: Ken.Gardner@powerpool.ab.ca@ENRON Sent: Wednesday, December 05, 2001 3:30 PM To: pat_cooper@transalta.com; mwindsor@enmax.com; mike.cooper@atcoelectric.com; kjdberg@epcor.ca; alr@city.red-deer.ab.ca; nigpim@city.medicine-hat.ab.ca; olenz@city.lethbridge.ab.ca; david.carmichael@atcopower.com; john.ell@atcopower.com; gord.mcphee@atcopower.com; alhoffort@epcor.ca; adele_birchill@transalta.com; bhan@epcor.ca; martin.merrit@engageenergy.com; wayne_occonnor@transcanada.com; Richey, Cooper; joeg@encoreenergy.com; wickhamc@novachem.com; pgschubert@dow.com; dmitchell@suncor.com; anderson.murray@syncrude.com; Marie_Gallant@PanCanadianEnergy.com; doug.heath@balancingpool.ca; lloyd_bures@transalta.com; dave_currie@transalta.com; royhanson@epcor.ca; chrisc@cnrl.com; denis.martin@airliquide.com; c.morgan@epcor.ca; brian_novak@transalta.com; joe.goebel@ualberta.ca Cc: Doug.Hincks@powerpool.ab.ca; jim_paton@transalta.com Subject: Supply Shortfall Procedures As I have discussed with many of you, we are revising the Power Pool Supply Shortfall Procedures (POP 801) in accordance with Transmission Operating Policy OP-107. POP 801 contains several steps from the time all the energy in the energy market merit order has been dispatched up, to the time when a firm load directive will be issued by the System Controller to curtail firm load. In order to gather the information required to develop the procedure, would you please answer the following questions. Any action you choose to take is on a voluntary and best effort basis, without any obligation on your behalf. In an effort to reduce the amount of, or possibility of having to issue, a firm load directive to curtail load, would you please reply whether you will comply with any of the following requests from the System Controller prior to the issuing of a firm load directive to curtail load. Please reply not applicable (N/A) to the questions that do not apply to you. If you will comply to any of these requests, we will include the request(s) in the steps identified in POP 801. Also, if you will comply to any of these requests, please indicate the appropriate party for the System Controller to contact. If you choose not to comply with any of these requests please reply that you will not. This will let us know not to make a request for something that will not be provided, which otherwise could cause confusion and waste valuable time during the management of this type of an event. 1. Would you provide available generation energy that was not offered into the energy market merit order if requested to do so by the System Controller prior to a firm load directive to curtail load? Name of Plant: Response (Y/N): If yes, please indicate who the System Controller is to contact: Name of Plant: Response (Y/N): If yes, please indicate who the System Controller is to contact: Name of Plant: Response (Y/N): If yes, please indicate who the System Controller is to contact: 2. Would you reduce non-essential station service loads at your plant(s) if requested to do so by the System Controller prior to a firm load directive to curtail load? Name of Plant: Response (Y/N): If yes, please indicate who the System Controller is to contact: Name of Plant: Response (Y/N): If yes, please indicate who the System Controller is to contact: Name of Plant: Response (Y/N): If yes, please indicate who the System Controller is to contact: 3. Would you reduce non-essential drag line loads (if applicable) if requested to do so by the System Controller prior to a firm load directive to curtail load? Location: Response (Y/N): If yes, please indicate who the System Controller is to contact: Location: Response (Y/N): If yes, please indicate who the System Controller is to contact: 4. Would you provide a 3% (or another value) reduction in distribution voltage if requested to do so by the System Controller prior to a firm load directive to curtail load? Name of Wire Service Provider: If yes, please indicate who the System Controller is to contact: Please email or fax your response to me by December 12. If you have any questions please contact me. Your reply (either way) is appreciated. Thank you, Ken Gardner Pool Code Analyst Power Pool of Alberta Phone: (403) 233-6416 Fax: (403) 543-0388
|